Headlines : HPSN 2023 Sebagai Momentum Pengelolaan Sampah Dalam Kontribusi Pengendalian Perubahan IklimPEMBUANGAN SAMPAH SEMBARANGAN DI TROTOAR TAMAN KOTASampah Kita adalah Tanggung Jawab Kita


Data Volume Sampah Per Bulan Tahun 2012

Oleh Administrator


Rabu, 09 Agustus 2017


NO

NAMA

DKP

DPP

UMUM

JUMLAH

RATA-RATA/HARI/BULAN

1

JANUARI

7.333.700

1.024.700

320.410

8.678.880

279.964

2

PEBRUARI

7.179.320

963.840

808.080

8.446.240

301.651

3

MARET

6.425.450

981.450

293.860

7.701.110

248.423

4

APRIL

6.117.110

843.450

294.010

7.254.570

241.819

5

MEI

5.997.480

835.000

279.400

7.111.880

229.415

6

JUNI

5.476.760

817.440

267.580

6.561.780

218.726

7

JULI

5.442.080

820.190

274.080

6.536.350

210.850

8

AGUSTUS

5.698.420

728.240

251.200

6.677.860

215.415

9

SEPTEMBER

5.412.340

732.860

263.680

6.408.880

213.629

10

OKTOBER

6.160.990

763.430

257.960

7.182.380

231.690

11

NOPEMBER

6.994.100

804.640

249.640

8.048.660

268.289

12

DESEMBER

6.894.800

855.410

297.550

9.047.750

291.863

JUMLAH (KG)

75.132.550

10.170.650

3.857.450

89.656.340

 

JUMLAH/TAHUN (TON)

75.133

10.171

3.857

89.161

 

JUMLAH/TAHUN (M3)

300.530

40.683

15.430

356.643

 

RATA-RATA/HARI (TON)

206

28

11

244

 

RATA-RATA/HARI (M3)

823

111

42

977